PT Prima Sarana Gemilang

Engineering - ABM Project

A trusted and reliable mining contractor in Indonesia and a leading technology-based, environmentally friendly mining company, always maintaining good relations with clients and customers and becoming a reference for ideal mining operations.

Weather Forecast

Daily weather in the Tompotika Valley area, PSG – ABM Project Site

loader-image
PT. Prima Sarana Gemilang's Site Project
4:59 pm, Jul 30, 2026
temperature icon 22°C
overcast clouds
Humidity: 84 %
Pressure: 1010 mb
Wind: 8 mph
Wind Gust: 17 mph
Clouds: 90%
Visibility: 10 km
Sunrise: 5:51 am
Sunset: 5:56 pm
  • Temperature
  • Precipitation
  • Rain Chance
  • Wind
  • Humidity
  • Pressure
5:00 pm
temperature icon
22°/22°°C 0 mm 0% 8 mph 84% 1010 mb 0 mm/h
8:00 pm
temperature icon
21°/22°°C 0.2 mm 20% 7 mph 87% 1011 mb 0 mm/h
11:00 pm
temperature icon
20°/21°°C 0.38 mm 38% 6 mph 92% 1012 mb 0 mm/h
2:00 am
temperature icon
19°/19°°C 0.27 mm 27% 6 mph 96% 1012 mb 0 mm/h
5:00 am
temperature icon
20°/20°°C 0.2 mm 20% 6 mph 95% 1012 mb 0 mm/h
8:00 am
temperature icon
23°/23°°C 0 mm 0% 8 mph 78% 1014 mb 0 mm/h
11:00 am
temperature icon
27°/27°°C 0 mm 0% 8 mph 57% 1012 mb 0 mm/h
2:00 pm
temperature icon
26°/26°°C 0 mm 0% 9 mph 64% 1010 mb 0 mm/h

Daily Report Production

Mine Accuracy, 19 June 2026

Unit Actual Running

Monday, 20 June 2026

Strategic Plan Area

ABM Project – PT Prima Sarana Gemilang

The New Project of Nickel Mining

Mine Nickel Operational

The Journey of Nickel Project