PT Prima Sarana Gemilang

Engineering - ABM Project

A trusted and reliable mining contractor in Indonesia and a leading technology-based, environmentally friendly mining company, always maintaining good relations with clients and customers and becoming a reference for ideal mining operations.

Weather Forecast

Daily weather in the Tompotika Valley area, PSG – ABM Project Site

loader-image
PT. Prima Sarana Gemilang's Site Project
4:00 am, Oct 10, 2026
temperature icon 20°C
overcast clouds
Humidity: 98 %
Pressure: 1011 mb
Wind: 4 mph
Wind Gust: 5 mph
Clouds: 100%
Visibility: 10 km
Sunrise: 5:31 am
Sunset: 5:38 pm
  • Temperature
  • Precipitation
  • Rain Chance
  • Wind
  • Humidity
  • Pressure
5:00 am
temperature icon
20°/20°°C 0.01 mm 1% 4 mph 98% 1012 mb 0 mm/h
8:00 am
temperature icon
22°/24°°C 0.2 mm 20% 4 mph 90% 1012 mb 0 mm/h
11:00 am
temperature icon
26°/29°°C 0 mm 0% 5 mph 67% 1012 mb 0 mm/h
2:00 pm
temperature icon
28°/28°°C 0 mm 0% 6 mph 56% 1009 mb 0 mm/h
5:00 pm
temperature icon
25°/25°°C 0 mm 0% 5 mph 66% 1010 mb 0 mm/h
8:00 pm
temperature icon
21°/21°°C 0 mm 0% 6 mph 88% 1012 mb 0 mm/h
11:00 pm
temperature icon
20°/20°°C 0 mm 0% 5 mph 93% 1012 mb 0 mm/h
2:00 am
temperature icon
20°/20°°C 0 mm 0% 5 mph 92% 1011 mb 0 mm/h

Daily Report Production

Mine Accuracy,

Unit Actual Running

Strategic Plan Area

ABM Project – PT Prima Sarana Gemilang

The New Project of Nickel Mining

Mine Nickel Operational

The Journey of Nickel Project